Internet Payment services are being enhanced. Receipt downloads are temporarily unavailable. For receipt requests, email SCDF_CSC@scdf.gov.sg with your SCDF reference number. Our team will assist you. We apologise for any inconvenience and thank you.

W.e.f. 1 Apr 2024 onwards, refresher training for Fire Station Emergency Medical Technicians will be enhanced and the In Camp Training period will be extended from 19 to 23 days. Please check with your Deputy Commander Fire Station or unit for more info.

W.e.f. 1 Jul 2024, SCDF will change its sender ID for NS Mobilisation matters from “91449746” to “80709995”. This follows the gov.sg SMS Sender ID announcement on 13 Jun 2024 and aims to help recipients recognise and authenticate SMSes from SCDF.

Please be informed that Bukit Batok Fire Station will not be hosting the weekly Saturday Fire Station Open House from 30 Sep 2023 to Feb 2025. Please refer to the list of other Fire Stations that are available for visits.

1

/

4

Definition and Criteria of Minor A&A

Lodgement of Minor Additions/Alterations Works (Minor A&A)

The lodgement scheme is only applicable to minor alterations or additions as set out in the Schedule (Fire Safety (Building and Pipeline Fire Safety) Regulations) under Regulation 4 and THE SCHEDULE - MINOR ALTERATIONS OR ADDITIONS NOT REQUIRING APPROVAL OF PLANS.

The plans shall be lodged by the following types of QPs:

  • Registered Architect; or
  • Professional Engineer (Civil); or
  • Professional Engineer (Structure); or
  • Professional Engineer (Mechanical); or
  • Professional Engineer (Electrical).

 

Submission Procedures

Electronic Submission

The Qualified Person shall make application to SCDF through CORENET e-submission before commencement of the MAA works. The fee for each submission is $90.The submission procedure is as follows:

Compliance to the following guidelines

The plan shall comprise of the following (Final MAA plan shall be submitted together with e-form MAACFSW.XFD):

  • Site plan / location plan;
  • Whole floor plan in detail - indicating clearly the exits / exit staircases available and the type of fire protection system for the building;
  • Detailed layout plan of the addition / alteration indicating:
    • The usage of all rooms / areas / compartments;
    • The contents of store(s);
    • The existing fire doors with rating;
    • The layout of sprinklers / detectors.
  • Sectional plan of the proposed works;
  • Details of partitions, including the type of construction / materials used;
  • The QP shall endorse on title block of the plan as follows:

"I __________(Qualified Person's name) in accordance with Regulation 4(5) of the Fire Safety (Building Fire Safety) Regulations hereby certify that the Minor Addition/Alteration works have been satisfactorily completed on _______ (date); and

 

"I certify that the addition / alteration works do not affect the existing fire protection system in accordance with Regulation 4(5) of the Fire Safety (Building Fire Safety) Regulations"; or

 

"I certify that the addition / alteration works as shown in these drawings affected the existing *sprinkler / automatic fire alarm systems and I have supervised the works on site to ensure that the said system(s) have been modified in accordance with Regulation 4(5) of the Fire Safety (Building Fire Safety) Regulations".

  • All proposed works shall be coloured magenta on plan whereas deletion shall be indicated in yellow dotted lines;
  • Applicant/Tenant needs to seek consent from the Building Owner / Management Corporation before carrying the MAA works.
  • Space of 150 mm x 100 mm on top right hand corner shall be kept blank for confidential manual plan submission for SCDF endorsement.