Internet Payment services are being enhanced. Receipt downloads are temporarily unavailable. For receipt requests, email SCDF_CSC@scdf.gov.sg with your SCDF reference number. Our team will assist you. We apologise for any inconvenience and thank you.

W.e.f. 1 Apr 2024 onwards, refresher training for Fire Station Emergency Medical Technicians will be enhanced and the In Camp Training period will be extended from 19 to 23 days. Please check with your Deputy Commander Fire Station or unit for more info.

W.e.f. 1 Jul 2024, SCDF will change its sender ID for NS Mobilisation matters from “91449746” to “80709995”. This follows the gov.sg SMS Sender ID announcement on 13 Jun 2024 and aims to help recipients recognise and authenticate SMSes from SCDF.

Please be informed that Bukit Batok Fire Station will not be hosting the weekly Saturday Fire Station Open House from 30 Sep 2023 to Feb 2025. Please refer to the list of other Fire Stations that are available for visits.

1

/

4

Search Fire Code
Include in Search
Clear All

Please enter a keyword to search

This chapter specifies the additional requirements peculiar to buildings of respective purpose groups. These additional requirements shall be read in conjunction with other requirements relevant to the respective purpose groups stipulated in Chapter 1 to 8 of this Code. Where there are conflicting requirements between this chapter and the preceding chapters, the requirements stipulated in this chapter shall take precedence.

9.1.1 General

a. Means of escape

(1) Single household dwelling

Buildings under PG I can consist of more than three floors if they are occupied as a single household dwelling.

(2) Basement levels

For PG I building which has four or more levels (including the basement storeys and attics), the floor immediately over the basement storeys shall be compartmented by compartment walls/ floors. Where there is an internal connection between the basement storeys and upper levels, it shall be compartmented by a fire-rated door at the 1st storey landing or basement landing. 

(3) Access staircases

Means of escape for a building or a separate part of a building of single occupancy of PG I can be provided via access staircase(s).

b. Structural fire precautions

(1) Attic floor

An attic in buildings under PG I can be constructed of timber boarding on timber joists, provided it is protected to achieve the fire resistance rating required of the elements of structure of the building or compartment.

(2) Floor over a basement

For PG I building which has four or more levels (including the basement storeys and attics), the floor immediately over the basement storeys shall be compartmented by compartment walls/ floors. Where there is an internal connection between the basement storeys and upper levels, it shall be compartmented by a fire-rated door at the 1st storey landing or basement landing. 

c. Extent of unprotected openings

(1) The extent of unprotected openings in an external wall of a building under PG I, in relation to its distance from the relevant boundary, can be based on the internal room/space in the building that has the largest extent of unprotected openings to comply with Table 1 of Annex 3B.

(2) Internal walls enclosing the room/space in the building except glazing, are not required to be fire-rated, but shall be constructed of non-combustible materials.

d. PV installation 

For PV installations the requirements shall be as follows: 

(1) For access to the PV installations on the roof, a portable sturdy or cat/ ship ladder to the roof access shall be provided.

(2) All access hatches, if provided, shall be readily accessible from the roof. The access hatch opening shall have a minimum clear width of 1m in diameter.

(3) A clearance of 1m around the access/ hatch opening shall be provided.

(4) For fire resistance of PV modules, it shall be in accordance with Cl.10.2.1c..

(5) For emergency disconnection of the PV modules, it shall be in accordance with Cl.10.2.1e..


Updated 2 Sep 2024