Internet Payment services are being enhanced. Receipt downloads are temporarily unavailable. For receipt requests, email SCDF_CSC@scdf.gov.sg with your SCDF reference number. Our team will assist you. We apologise for any inconvenience and thank you.

W.e.f. 1 Apr 2024 onwards, refresher training for Fire Station Emergency Medical Technicians will be enhanced and the In Camp Training period will be extended from 19 to 23 days. Please check with your Deputy Commander Fire Station or unit for more info.

W.e.f. 1 Jul 2024, SCDF will change its sender ID for NS Mobilisation matters from “91449746” to “80709995”. This follows the gov.sg SMS Sender ID announcement on 13 Jun 2024 and aims to help recipients recognise and authenticate SMSes from SCDF.

Please be informed that Bukit Batok Fire Station will not be hosting the weekly Saturday Fire Station Open House from 30 Sep 2023 to Feb 2025. Please refer to the list of other Fire Stations that are available for visits.

1

/

4

Search TRSS
Include in Search
Clear All

Please enter a keyword to search

2.3.1 SS Wall Thickness

The thickness of SS wall varies accordingly to SS clear height and the setback distance. The thickness shall comply with the following requirements:

a. The minimum SS wall thickness shall be in accordance with TABLE 2.3.1.

b. Wall thickness of any SS or NS within the SS tower shall not be less than the wall thickness of the SS or NS above it.

c. Internal common wall between 2 adjacent SS shall be at least 200mm thick. Refer to FIGURE 2.3.1.

d. The minimum internal common wall thickness between SS and enclosed NS shall be 200mm. The minimum internal common wall thickness between SS and non-enclosed NS shall be 300mm. Refer to FIGURE 2.12.2(i).

e. For internal SS and S/C SS length more than 8000mm, an additional 25mm thickness shall be provided to the affected SS wall. Refer to FIGURE 2.2.1(a) and 2.2.1(b).

2.3.2 Slab Thickness of SS and Enclosed NS

The minimum dimensions of members forming part of the SS tower shall be as follows:

a. Ceiling slab of top-most SS or S/C SS or scissor S/C SS – 300mm. Refer to FIGURE 2.3.2.

b. Slab between two SS or S/C SS or scissor S/C SS – 200mm. Refer to FIGURE 2.3.2.

c. Floor slab of bottom-most SS/NS in contact with soil – 300mm. Refer to FIGURE 2.3.2.

d. Slab between SS or S/C SS and enclosed NS - 200mm - Refer to FIGURE 2.3.2.

2.3.3 Slab Thickness of SS and Non-Enclosed NS

a. Floor slab of bottom-most SS that is directly supported by non-enclosed NS or NS wall - 300mm. Refer to FIGURE 2.3.2.

b. Ceiling slab of SS which is below non-enclosed NS or NS wall - 300mm.

c. Slab between two non-enclosed NS - 300mm.