Internet Payment services are being enhanced. Receipt downloads are temporarily unavailable. For receipt requests, email SCDF_CSC@scdf.gov.sg with your SCDF reference number. Our team will assist you. We apologise for any inconvenience and thank you.

W.e.f. 1 Apr 2024 onwards, refresher training for Fire Station Emergency Medical Technicians will be enhanced and the In Camp Training period will be extended from 19 to 23 days. Please check with your Deputy Commander Fire Station or unit for more info.

W.e.f. 1 Jul 2024, SCDF will change its sender ID for NS Mobilisation matters from “91449746” to “80709995”. This follows the gov.sg SMS Sender ID announcement on 13 Jun 2024 and aims to help recipients recognise and authenticate SMSes from SCDF.

Please be informed that Bukit Batok Fire Station will not be hosting the weekly Saturday Fire Station Open House from 30 Sep 2023 to Feb 2025. Please refer to the list of other Fire Stations that are available for visits.

1

/

4

Search TRSS
Include in Search
Clear All

Please enter a keyword to search

The following shall be observed:

a. Only the non-removable type of form-tie (form-tie without through opening) to secure formwork before casting of SS wall is permitted. Upon the removal of every recessible type of plastic cones from the form-tie, the recess shall be sealed with non-shrink grout. The use of reinforcement bar as form-tie is not permitted.

b. To avoid bending, warping or displacement of HS door frame and honeycombing due to inadequate compaction or leakage of cementitious grout, additional precaution to ensure adequate compaction shall be taken while casting the concrete near the SS door frame.

c. All embedded items shall be placed and tightly secured in their intended location to ensure their stability during casting. All hacking and drilling of SS tower walls, ceiling slabs or floor slabs are not permitted without prior approval from the Commissioner of Building Control.

d. The exposed surfaces of SS walls and soffit of SS ceiling slabs shall be cast with smooth concrete finish. A maximum of 2mm thick skim coat on the internal face of the SS walls and ceiling slabs of SS is allowed.

e. The concrete structural elements shall be adequately compacted to ensure air- tightness. Concrete areas with segregation or honeycombing shall not be hacked and plastered back without prior approval from the Commissioner of Building Control.

f. Irregularities of exposed surfaces shall not be hacked and plastered back without prior approval from the Commissioner of Building Control.

g. Method statement of the remedial work on structural elements, including SS door frame, shall be approved by the Commissioner of Building Control.