Internet Payment services are being enhanced. Receipt downloads are temporarily unavailable. For receipt requests, email SCDF_CSC@scdf.gov.sg with your SCDF reference number. Our team will assist you. We apologise for any inconvenience and thank you.

W.e.f. 1 Apr 2024 onwards, refresher training for Fire Station Emergency Medical Technicians will be enhanced and the In Camp Training period will be extended from 19 to 23 days. Please check with your Deputy Commander Fire Station or unit for more info.

W.e.f. 1 Jul 2024, SCDF will change its sender ID for NS Mobilisation matters from “91449746” to “80709995”. This follows the gov.sg SMS Sender ID announcement on 13 Jun 2024 and aims to help recipients recognise and authenticate SMSes from SCDF.

Please be informed that Bukit Batok Fire Station will not be hosting the weekly Saturday Fire Station Open House from 30 Sep 2023 to Feb 2025. Please refer to the list of other Fire Stations that are available for visits.

Our feedback form is temporarily unavailable due to technical issues. To reach us, please write to us via the emails listed on https://www.scdf.gov.sg/home/contact-info. Thank you for your patience and understanding.

1

/

5

Search TRHS
Include in Search
Clear All

Please enter a keyword to search

2.3.1 Wall Thickness of HS and NS

a. The minimum HS and NS wall thickness shall be in accordance with TABLE 2.3.1(a) for landed development and TABLE 2.3.1(b) for non-landed development.

b. Wall thickness of any HS or NS within the HS tower shall not be less than the wall thickness of the HS or NS above it.

c. The minimum thickness of the internal common wall between two adjacent HS for non-landed and landed cluster housing developments shall be 200mm thick. See FIGURE 2.3.1(c).

d. For landed developments where the two HS are abutting each other, the common wall shall be cast as two separate adjoining walls. See FIGURE2.3.1(d).

e. The minimum thickness of the basement HS wall facing a reinforced concrete basement storey wall without any opening within the influence zone shall be 200mm. See FIGURE 2.4.6(a) and (b).

f. The minimum thickness of the basement HS wall which is in direct contact with earth throughout its entire height shall be in accordance with FIGURE 2.4.6(c).

g. The minimum thickness of the basement HS wall facing a reinforced concrete basement storey wall with opening within the influence zone shall be in accordance with TABLE 2.3.1(a).

2.3.2 Slab Thickness of HS and Enclosed NS

a. Ceiling slab of top-most HS in non-landed development - 300mm. See FIGURE 2.3.2.

b. Slab between 2 HS - 175mm. See FIGURE 2.3.2.

c. Floor slab of bottom-most HS without NS below – 200mm. See FIGURE 2.3.2.

d. Floor slab of bottom-most NS in contact with soil – 200mm.

e. Slab between 2 enclosed NS – 175mm. See FIGURE 2.3.2.

f. Slab between HS and enclosed NS – 175mm. See FIGURE 2.3.2.

g. Ceiling slab of top-most HS in landed development – 300mm or 250mm (if there is a RC roof or another RC slab above the HS that is equal or extend beyond the required setback distance of that HS wall). See FIGURE 2.3.2(f).

2.3.3 Slab Thickness of HS and Non-Enclosed NS

a. Floor slab of HS that is directly supported by non-enclosed NS, NS walls or columns – 300mm. See FIGURE 2.3.2.

b. Ceiling slab of HS which is below non-enclosed NS, NS walls or columns – 300mm. See FIGURE 2.3.2.

c. Slab between 2 non-enclosed NS – 175 mm. See FIGURE 2.3.2.