Internet Payment services are being enhanced. Receipt downloads are temporarily unavailable. For receipt requests, email SCDF_CSC@scdf.gov.sg with your SCDF reference number. Our team will assist you. We apologise for any inconvenience and thank you.

W.e.f. 1 Apr 2024 onwards, refresher training for Fire Station Emergency Medical Technicians will be enhanced and the In Camp Training period will be extended from 19 to 23 days. Please check with your Deputy Commander Fire Station or unit for more info.

W.e.f. 1 Jul 2024, SCDF will change its sender ID for NS Mobilisation matters from “91449746” to “80709995”. This follows the gov.sg SMS Sender ID announcement on 13 Jun 2024 and aims to help recipients recognise and authenticate SMSes from SCDF.

Please be informed that Bukit Batok Fire Station will not be hosting the weekly Saturday Fire Station Open House from 30 Sep 2023 to Feb 2025. Please refer to the list of other Fire Stations that are available for visits.

Our feedback form is temporarily unavailable due to technical issues. To reach us, please write to us via the emails listed on https://www.scdf.gov.sg/home/contact-info. Thank you for your patience and understanding.

1

/

5

Search TRHS
Include in Search
Clear All

Please enter a keyword to search

7.2.1 Permitted Works to HS

a. Laying of floor tiles bonded to wet cement mortar. The total thickness of floor finishes and screed shall not exceed 50mm.

b. Laying of floor skirting tiles (up to a maximum of 100mm high) by bonding them with wet cement mortar to HS walls.

c. Laying of vinyl or linoleum flooring.

d. Applying splatter dash or equivalent to the external face of HS walls only to provide rough surface for feature wall panels or wall tiles installation.

e. Painting of walls, ceiling or door. In the case of HS door, owners shall not cover up or paint over the HS door notice (See Clause 5.3), locking bolts or door seal. The old paint coat on door and door frame is to be removed prior to repainting to avoid increase paint thickness resulting in difficulty in closing and opening of the door. The new paint coat must be dried up completely before closing the door as wet or damp paint will cause the door/ rubber gasket to stick onto the door frame when opening the door.

f. Painting on only the exterior face of the 6mm fragmentation stainless steel plate of the ventilation sleeves.

g. Drilling into internal face of HS walls and ceiling slabs to a depth of not more than 50mm to affix inserts and removable screws is allowed. Fixtures such as pictures, posters, cabinets or shelves on internal face of HS walls will have to be removed by the owners within 48 hours upon notification. There is no restriction to the diameter of the non-metallic insert as long as it does not exceed 50mm in length. It is the owner’s responsibility to ensure that the strength of the insert is adequately provided for the intended purpose.

h. Power driven nails are allowed only on external face of the HS walls to facilitate flexibility in mounting of features/ fixtures by owners.

i. Fragmentation plates (Clause 4.4) of the ventilation sleeves are allowed to be removed provided that the fragmentation plates and its bolts and nuts are mounted or kept together for use when needed. If the plate is to be mounted on the HS wall, it shall be done in accordance with  Clause 7.2.1(g).

j. Closing or covering up of ventilation openings by removable aesthetic or architectural finishes is allowed, provided that at least 25% of the total area of the two openings shall be left uncovered for ventilation purposes during peacetime.

k. The minimum clearance from the fragmentation plate to RC beam or structure or service shall be 50mm. Where the RC beam or structure or service is fronting the fragmentation plate of ventilation sleeve, the clear distance between them shall be at least 500mm. See FIGURE 4.3.1.

l. Where false ceilings are provided outside the HS and below the ventilation sleeves, there shall be perforated access panels of minimum size of 600mm x 600mm positioned directly below each ventilation sleeve. See FIGURE 4.3.2.

7.2.2 Not Permitted Works to HS

a. Laying of wall tiles or spray of rock stone finish, cement sand finish and gypsum plastering on the internal faces of HS walls.

b. Laying of floor tiles using adhesive materials.

c. Laying of 2nd layer of tiles on floor or skirting tiles.

d. Installation of cornices within the HS.

e. Installation works with fixings using power driven nails into the internal HS walls.

f. Tampering with, removing or covering up of the HS door notice. The HS door notice provides important information to the occupants on the use of the HS.

g. Hacking and drilling of HS walls, floor slabs, and ceiling slabs other than drilling permitted in Clause 7.2.1(g) and  7.2.1(h)

h. Hacking to both internal and external face of the household shelter walls to form key for tiling.

i. Hacking on external face of HS wall for mounting of feature wall panels or wall tiles installation.

j. Modifying, changing, removing or tampering of HS door.

k. Modifying, altering or tampering with any part of the ventilation openings, plates and the mounting devices such as bolts and nuts.

l. Painting to the interior face of the 6mm fragmentation stainless steel plate of the ventilation sleeves, the ventilation sleeves, “O” ring rubber gaskets and the four or eight numbers of stainless-steel bolts which hold the steel plate to the sleeves.

7.2.3 Not Permitted Works to NS

Hacking and drilling of NS walls, columns, floor slabs and ceiling slabs.