Internet Payment services are being enhanced. Receipt downloads are temporarily unavailable. For receipt requests, email SCDF_CSC@scdf.gov.sg with your SCDF reference number. Our team will assist you. We apologise for any inconvenience and thank you.

W.e.f. 1 Apr 2024 onwards, refresher training for Fire Station Emergency Medical Technicians will be enhanced and the In Camp Training period will be extended from 19 to 23 days. Please check with your Deputy Commander Fire Station or unit for more info.

W.e.f. 1 Jul 2024, SCDF will change its sender ID for NS Mobilisation matters from “91449746” to “80709995”. This follows the gov.sg SMS Sender ID announcement on 13 Jun 2024 and aims to help recipients recognise and authenticate SMSes from SCDF.

Please be informed that Bukit Batok Fire Station will not be hosting the weekly Saturday Fire Station Open House from 30 Sep 2023 to Feb 2025. Please refer to the list of other Fire Stations that are available for visits.

1

/

4

Search Fire Code
Include in Search
Clear All

Please enter a keyword to search

ANNEX 9.9A : INSPECTION CHECKLIST FOR BUILDING  UNDER CONSTRUCTION
S/No. Description In Order If no, remedy action/comments
Yes No

PART A : PROVISION OF FIREFIGHTING SYSTEMS

Rising Mains

1

Dry rising mains shall be installed progressively during the course of construction as per approved plan and made operational for all storeys except the uppermost 3 storeys, for building exceeding 8 storeys or habitable height of 24m.

   

2

Wet rising mains shall be installed progressively during the course of construction as per approved plan and made operational for all storeys except the uppermost 3 storeys, for building exceeding 18 storeys or habitable height of 60m. The following shall be provided:

(a) break tank with minimum water capacity of 11.5m3; and

(b) fire pumps which are operational and supplied with emergency power supply.

   

3

Provision of breeching inlets (2-way/4-way)* provided as per approved plan. The following shall be complied with:

(a) breeching inlets made operational and housed in protective enclosure; and

(b) labelled and numbered accordingly.

   

4

Riser stacks are labelled and numbered and:

(a) earthing is provided; and

(b) air relief valve is provided.

   

5

Landing valves provided with blank caps and are strapped and padlocked in closed position.

   

Lift

6

Lift/passenger hoist ready for firefighters’ use shall be provided for building exceeding 8 storeys or habitable height of 24m.

   

Generator

7

Generator set or adequate PUB power supply shall be

provided for emergency lighting and firefighting purpose.

   

Fire Engine Accessway

8

Provision of adequate fire engine accessway (where practicable) for firefighting purpose.

   

Fire Extinguisher

9

At least one fire extinguisher of 13A rating shall be provided for every 500m² or less on each floor. Where provision of fire engine accessway is not practicable, the quantity of fire extinguishers shall be doubled on each floor.

   

PART B : TESTING OF RISING MAINS

Breeching inlet

1

Inlet housed in protective enclosure.

   

2

Rigidly support

   

3

Labelled “dry/wet riser inlet” and numbered accordingly

   

4

Clear of obstruction

   

Riser

5

Air relief valve provided

   

6

Labelled & numbered accordingly

   

7

Earthing provided

   

Landing Valve

8

Blank cap provided

   

9

Strapped and padlock in closed position

   

10

Clear of obstruction

   

Pressure/Flow

11

Rising mains pipping

Hydrostatically tested at 1380 kPa (13.8 bar) or 1.5 times the design pressure, whichever is greater, for 2 hours.

   

12

Wet rising mains

(a) Flow rate at the topmost fully-opened landing valve (under pump/gravity feed) is at least 27 L/s; and

(b) Running pressure is between 2 bars and 5.5 bars at the landing valve

  

 

* Delete as appropriate

 

Date inspected:_________________ by__________________________ Signature______________________